|
The project pictured involved back-propping of existing low level basement wall and floor slab removal, enabling builder to pour a new, lower level floor slab, thus increasing useable area of existing building.
All this work was carried out while the hospital remained operational.
As with all projects shown, the workmen completed the project safely within time and budget constraints.
Email us today for further information.
|
|